ERC CASE NO. 2001-898 AND 2001-503
RATE SCHEDULE
May 2017
Gen. Retail Gen. Retail Gen. Retail
Residential Service 1 Service 2 Service 3 Gen. Retail Flat
(< = 20KW) (>20KW & (> 40KW & Service 4 Lighting
<=40KW) < = 200KW) (> 200KW) Service
Generation Charge (PhP/kWh) 3.7371 3.7371 3.7371 3.7371 3.7371 3.7371
Transmission Charge (PhP/Kwh) 0.5666 0.6207 0.5179 0.4943 0.4423 0.7983
(PhP/KW) 286.4078 169.5946 219.6319
Distribution Charge (PhP/Kwh) 1.9002 1.9002 0.3193 0.2748 0.0000 2.0783
(PhP/KW) 362.12 291.08 345.77
Customer Charges
Supply Charge (PhP/Cust/Mo.) 138.97 285.92 2,008.16 78.96
(PhP/Kwh) 0.1802 0.1802
Metering Charge (PhP/Meter/Mo.) 5.00 5.00 237.39 338.21 4,540.26 0
(PhP/Kwh) 0.4573 0.4573
Fuel Recovery Charge (PhP/Kwh) - - - - - -
Fuel Recovery ERC Case#2011-068RC 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Automatic Fuel Recovery (Php/kwh) 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009
System Loss Charge (PhP/Kwh) 0.3298 0.3353 0.4311 0.3797 0.3707 0.3514
Inter-Class Cross
Subsidy (PhP/Kwh) - - - - - -
Lifeline Rate Subsidy (PhP/Kwh) 0.0652 0.0652 0.0652 0.0652 0.0652
(In excess of 80 Kwh) 0.0652
Senior Citizen Subsidy (Php/Kwh) 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003
Universal Charge (PhP/Kwh)
Missionary Electrification 0.1561 0.1561 0.1561 0.1561 0.1561 0.1561
UCME - Subsidy 0.0454 0.0454 0.0454 0.0454 0.0454 0.0454
UCME - True-up Adjustment for Cys 2003-2009 and for CY 2011 0.0709 0.0709 0.0709 0.0709 0.0709 0.0709
UCME - True-up Adjustment for CY 2010 0.0381 0.0381 0.0381 0.0381 0.0381 0.0381
UCME - RE Developer 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017
Environmental Charge 0.0025 0.0025 0.0025 0.0025 0.0025 0.0025
Stranded Contract Costs 0.1938 0.1938 0.1938 0.1938 0.1938 0.1938
Feed-in Tariff Allowance (FIT-ALL) 0.1240 0.1240 0.1240 0.1240 0.1240 0.1240
VAT RATES:
Generation Rate VAT 0.2783 0.2783 0.2783 0.2783 0.2783 0.2783
Transmission Rate VAT 0.0021 0.0023 0.0060 0.0040 0.0037 0.0029
System Losses VAT 0.0240 0.0240 0.0240 0.0240 0.0240 0.0240
Genco 0.0238 0.0238 0.0238 0.0238 0.0238 0.0238
Transco 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002
Distribution Revenue (02-01-06) 12.00% 12.00% 12.00% 12.00% 12.00% 12.00%
Other Charges 12.00% 12.00% 12.00% 12.00% 12.00% 12.00%
Power Act Reduction Rate 80.19%(0.24056)
NPC/TSI/WMPC/TMI/SPPC & NGCP Rate -

 

Note:
1. Local Franchise Tax for Sultan Kudarat & Datu Odin Sinsuat Maguindanao Customers is 0.5%
2.  12% VAT on distribution & other charges effective Feb. 1, 2006.
3.  Fuel & Lubricant cost recovery of  Php0.0298/kwhr starting October, 2010 billing (ERC Case No. 2010-023 RC).
4.  Universal Charge for Missionary Electrification  is PhP0.1163  starting Sept. 2011 billing.  ERC order under  ERC Case No. 2011-074 RC.
NPC-SPUG Recovery of the shortfalls in the ME subsidy  for CY 2003 to 2009 under the True-up Mechanism pursuant to the
Commission's Resolution No. 11. Series of 2005 is PhP0.0709/Kwh on top of the existing UC-ME of PhP0.0454/Kwh.
5. Universal Charge for Stranded Contract Costs of PhP0.1938/kWh starting April 2013 Billing. ERC Case No. 2011-091 RC docketed Feb. 19, 2013.
6. Universal Charge for Missionary Electrification RE Developer of PhP0.0017/kWh starting January 2014 Billing. ERC Case No. 2012-085
RC docketed Oct. 14, 2013.
7. Feed-In-Tariff Allowance of PhP0.0406/kWh implemented starting Feb. 2015 billng in compliance with ERC Case No. 2014-019 RC.
8. Feed-In-Tariff Allowance increased from Php0.0406/kWh to Php0.1240/kWh effective April 2016 rate/billing in compliance with ERC Case No. 2015-216 RC Order
dtd. 2/16/16.
9.   SPPC under recovery in the amount of Php 16,331,594.80 including VAT at Php0.0913 & 0.0110 will be recovered starting January 2017 to Dec. 2017.

 

Gen. Retail Gen. Retail Gen. Retail
Residential Service 1 Service 2 Service 3 Gen. Retail Flat
(< = 20KW) (>20KW & (> 40KW & Service 4 Lighting
<=40KW) < = 200KW) (> 200KW) Service
Generation Charge (PhP/kWh) 3.7371 3.7371 3.7371 3.7371 3.7371 3.7371
Transmission Charge (PhP/Kwh) 0.5666 0.6207 0.5179 0.4943 0.4423 0.7983
(PhP/KW) 286.4078 169.5946 219.6319
Distribution Charge (PhP/Kwh) 1.9002 1.9002 0.3193 0.2748 0.0000 2.0783
(PhP/KW) 362.12 291.08 345.77
Customer Charges
Supply Charge (PhP/Cust/Mo.) 138.97 285.92 2,008.16 78.96
(PhP/Kwh) 0.1802 0.1802
Metering Charge (PhP/Meter/Mo.) 5.00 5.00 237.39 338.21 4,540.26 0
(PhP/Kwh) 0.4573 0.4573
Fuel Recovery Charge (PhP/Kwh) - - - - - -
Fuel Recovery ERC Case#2011-068RC 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Automatic Fuel Recovery (Php/kwh) 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009
System Loss Charge (PhP/Kwh) 0.3298 0.3353 0.4311 0.3797 0.3707 0.3514
Inter-Class Cross
Subsidy (PhP/Kwh) - - - - - -
Lifeline Rate Subsidy (PhP/Kwh) 0.0652 0.0652 0.0652 0.0652 0.0652
(In excess of 80 Kwh) 0.0652
Senior Citizen Subsidy (Php/Kwh) 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003
Universal Charge (PhP/Kwh)
Missionary Electrification 0.1561 0.1561 0.1561 0.1561 0.1561 0.1561
UCME - Subsidy 0.0454 0.0454 0.0454 0.0454 0.0454 0.0454
UCME - True-up Adjustment for Cys 2003-2009 and for CY 2011 0.0709 0.0709 0.0709 0.0709 0.0709 0.0709
UCME - True-up Adjustment for CY 2010 0.0381 0.0381 0.0381 0.0381 0.0381 0.0381
UCME - RE Developer 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017
Environmental Charge 0.0025 0.0025 0.0025 0.0025 0.0025 0.0025
Stranded Contract Costs 0.1938 0.1938 0.1938 0.1938 0.1938 0.1938
Feed-in Tariff Allowance (FIT-ALL) 0.1240 0.1240 0.1240 0.1240 0.1240 0.1240
VAT RATES:
Generation Rate VAT 0.2783 0.2783 0.2783 0.2783 0.2783 0.2783
Transmission Rate VAT 0.0021 0.0023 0.0060 0.0040 0.0037 0.0029
System Losses VAT 0.0240 0.0240 0.0240 0.0240 0.0240 0.0240
Genco 0.0238 0.0238 0.0238 0.0238 0.0238 0.0238
Transco 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002
Distribution Revenue (02-01-06) 12.00% 12.00% 12.00% 12.00% 12.00% 12.00%
Other Charges 12.00% 12.00% 12.00% 12.00% 12.00% 12.00%
Power Act Reduction Rate 80.19%(0.24056)
NPC/TSI/WMPC/TMI/SPPC & NGCP Rate -